{"id":95191,"date":"2026-04-10T12:29:08","date_gmt":"2026-04-10T10:29:08","guid":{"rendered":"https:\/\/infotorrent.es\/?p=95191"},"modified":"2026-04-10T12:34:45","modified_gmt":"2026-04-10T10:34:45","slug":"el-consorci-provincial-de-bombers-iniciara-en-maig-la-reforma-integral-del-parc-de-torrent","status":"publish","type":"post","link":"https:\/\/infotorrent.es\/ca\/noticies\/seguretat-ciutadana\/el-consorci-provincial-de-bombers-iniciara-en-maig-la-reforma-integral-del-parc-de-torrent\/","title":{"rendered":"El Consorci Provincial de Bombers iniciar\u00e0 en maig la reforma integral del Parc de Torrent"},"content":{"rendered":"\n<p>L&#8217;actuaci\u00f3, adjudicada per m\u00e9s de 2 milions d&#8217;euros, permetr\u00e0 modernitzar unes instal\u00b7lacions amb quasi 30 anys d&#8217;antiguitat, mitjan\u00e7ant la renovaci\u00f3 completa de l&#8217;edifici, la millora de l&#8217;hangar i noves dotacions per al personal operatiu<\/p>\n\n\n\n<p>El Consorci Provincial de Bombers, entitat dependent de la Diputaci\u00f3 de Val\u00e8ncia, ha adjudicat ja les obres de reforma integral del Parc de Bombers de Torrent, que comen\u00e7aran en el mes vinent de maig i que compten amb un termini d&#8217;execuci\u00f3 de 16 mesos.<\/p>\n\n\n\n<p>El president del Consorci i diputat de Medi Ambient, Avelino Mascarell, explica que &#8220;es tracta d&#8217;una actuaci\u00f3 estrat\u00e8gica que permetr\u00e0 adaptar les instal\u00b7lacions a les necessitats actuals despr\u00e9s de prop de tres d\u00e8cades d&#8217;\u00fas&#8221; i emmarca esta actuaci\u00f3 en &#8220;el proc\u00e9s actualitzaci\u00f3 d&#8217;infraestructures clau del Consorci, tant des del punt de vista operatiu com de les condicions del personal\u201d.<\/p>\n\n\n\n<p>El projecte contempla una reorganitzaci\u00f3 completa dels espais interiors. En la planta baixa s&#8217;habilitaran zones clau per al dia a dia del servici, com s\u00f3n la sala de control, gimn\u00e0s, cuina, menjador, despatxos administratius, vestuaris, bugaderia i \u00e0rees d&#8217;emmagatzematge, a m\u00e9s d&#8217;espais espec\u00edfics per a intervenci\u00f3 i equipament.<\/p>\n\n\n\n<p>L&#8217;edificaci\u00f3 comptar\u00e0 tamb\u00e9 amb una planta superior en la qual hi haur\u00e0 estades per al descans del personal i sales de reunions, entre altres. En este aspecte, Mascarell ha incidit en qu\u00e8 \u201cla millora de les condicions de treball i descans dels bombers \u00e9s fonamental per a garantir un servici efica\u00e7, especialment en parcs amb alta c\u00e0rrega operativa com el de Torrent\u201d.<\/p>\n\n\n\n<p>La reforma inclou tamb\u00e9 actuacions rellevants en l&#8217;hangar, on es renovar\u00e0 la fusteria, es refor\u00e7ar\u00e0 l&#8217;estructura i se substituir\u00e0 la coberta, a m\u00e9s de millorar el sistema de recollida d&#8217;aig\u00fces pluvials.<\/p>\n\n\n\n<p>Aix\u00ed mateix, es preveu la substituci\u00f3 de la fusteria exterior de l&#8217;edifici, la construcci\u00f3 d&#8217;una marquesina per a aparcament en la parcel\u00b7la i l&#8217;execuci\u00f3 d&#8217;un nou dep\u00f2sit d&#8217;aigua destinat a les boques d&#8217;incendi equipades (BIEs).<\/p>\n\n\n\n<p><strong>Inversi\u00f3 hist\u00f2rica per a refor\u00e7ar el servici en tota la prov\u00edncia<\/strong><\/p>\n\n\n\n<p>L&#8217;actuaci\u00f3 prevista al Parc de Bombers de Torrent s&#8217;emmarca en el pla d&#8217;inversions aprovat recentment per l&#8217;Assemblea General del Consorci que contempla la mobilitzaci\u00f3 de prop de 30 milions d&#8217;euros per a millorar la capacitat de resposta davant emerg\u00e8ncies en el conjunt de la prov\u00edncia.<\/p>\n\n\n\n<p>Esta modificaci\u00f3 pressupost\u00e0ria permetr\u00e0 donar resposta a les principals necessitats detectades en els \u00faltims anys, especialment en mat\u00e8ria d&#8217;infraestructures, renovaci\u00f3 de la flota de vehicles i millora de l&#8217;equipament operatiu.<\/p>\n\n\n\n<p>El president del Consorci i diputat de Medi Ambient, Avelino Mascarell, destaca que es tracta de \u201cla major inversi\u00f3 del Consorci en les \u00faltimes dos d\u00e8cades\u201d, i indica que &#8220;el pla contempla actuacions en diferents instal\u00b7lacions estrat\u00e8giques de la prov\u00edncia, aix\u00ed com la construcci\u00f3 de nous equipaments i la incorporaci\u00f3 progressiva de vehicles especialitzats i mitjans t\u00e8cnics avan\u00e7ats per a la intervenci\u00f3&#8221;.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent3-1024x576.jpeg\" alt=\"\" class=\"wp-image-95180\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent3-1024x576.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent3-300x169.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent3-768x432.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent3-1536x864.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent3.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"95187\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent-1024x576.jpeg\" alt=\"\" class=\"wp-image-95187\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent-1024x576.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent-300x169.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent-768x432.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent-1536x864.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"95183\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent4-1024x576.jpeg\" alt=\"\" class=\"wp-image-95183\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent4-1024x576.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent4-300x169.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent4-768x432.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent4-1536x864.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent4.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"95185\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent2-1024x576.jpeg\" alt=\"\" class=\"wp-image-95185\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent2-1024x576.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent2-300x169.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent2-768x432.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent2-1536x864.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/04\/torrent2.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>L&#8217;actuaci\u00f3, adjudicada per m\u00e9s de 2 milions d&#8217;euros, permetr\u00e0 modernitzar unes instal\u00b7lacions amb quasi 30 anys d&#8217;antiguitat, mitjan\u00e7ant la renovaci\u00f3 completa de l&#8217;edifici, la millora de l&#8217;hangar i noves dotacions per al personal operatiu El Consorci Provincial de Bombers, entitat dependent de la Diputaci\u00f3 de Val\u00e8ncia, ha adjudicat ja les obres de reforma integral del [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":95180,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1154,124,142,1145,133,1160,140],"tags":[],"class_list":["post-95191","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-seguretat-ciutadana-i-mobilitat-ca","category-seguretat-ciutadana","category-seguridad-ciudadana-y-mobilidad","category-seguridad-ciudadana-y-movilidad-ca","category-urbanisme","category-urbanismo-noticias-ca","category-urbanismo-3"],"acf":[],"_links":{"self":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/95191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/comments?post=95191"}],"version-history":[{"count":1,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/95191\/revisions"}],"predecessor-version":[{"id":95193,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/95191\/revisions\/95193"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media\/95180"}],"wp:attachment":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media?parent=95191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/categories?post=95191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/tags?post=95191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}