{"id":88993,"date":"2025-11-21T12:20:45","date_gmt":"2025-11-21T11:20:45","guid":{"rendered":"https:\/\/infotorrent.es\/?p=88993"},"modified":"2025-11-21T12:23:58","modified_gmt":"2025-11-21T11:23:58","slug":"torrent-finalitza-les-obres-que-posen-fi-a-decades-dinundacions-al-carrer-sant-rosa-de-lima","status":"publish","type":"post","link":"https:\/\/infotorrent.es\/ca\/noticies\/torrent-finalitza-les-obres-que-posen-fi-a-decades-dinundacions-al-carrer-sant-rosa-de-lima\/","title":{"rendered":"Torrent finalitza les obres que posen fi a d\u00e8cades d&#8217;inundacions al carrer Sant Rosa de Lima"},"content":{"rendered":"\n<p><strong>La intervenci\u00f3 soluciona un dels punts m\u00e9s conflictius del Vedat i aporta seguretat, benestar i tranquil\u00b7litat als ve\u00efns<\/strong><\/p>\n\n\n\n<p>L&#8217;Ajuntament de Torrent ha concl\u00f2s les obres de millora del drenatge pluvial al carrer Sant Rosa de Lima, una actuaci\u00f3 llargament esperada i reclamada pels ve\u00efns del Vedat, especialment pels residents de la zona i els usuaris de la resid\u00e8ncia de majors situada en este enclavament. L&#8217;execuci\u00f3 es tanca amb \u00e8xit despr\u00e9s de diversos mesos de treballs que han perm\u00e9s modernitzar per complet la capacitat hidr\u00e0ulica de la via, resolent un problema hist\u00f2ric d&#8217;acumulaci\u00f3 d&#8217;aigua que afectava des de fa d\u00e8cades a vivendes, accessos i espais p\u00fablics.<\/p>\n\n\n\n<p><strong>Una obra clau per a eliminar les inundacions<\/strong><\/p>\n\n\n\n<p>El carrer Sant Rosa de Lima se situa en un punt especialment vulnerable, una zona de pendent que actua com a corredor natural d&#8217;escorrenties procedents de les cotes m\u00e9s altes del Vedat. En episodis de pluges intenses -cada vegada m\u00e9s freq\u00fcents i torrencials- l&#8217;aigua s&#8217;acumulava en el t\u00e0lveg situat enfront de la resid\u00e8ncia de majors, generant inundacions recurrents i situacions de risc tant per a persones com per a b\u00e9ns materials.<\/p>\n\n\n\n<p>L&#8217;antiga xarxa de drenatge, dotada \u00fanicament de reixetes tipus tramex connectades a un col\u00b7lector DN 300 mm, resultava clarament insuficient i havia quedat totalment desbordada enfront dels cabals actuals. Este d\u00e8ficit estructural provocava anegamientos que es reprodu\u00efen any rere any, afectant vivendes, accessos i a la pr\u00f2pia resid\u00e8ncia.<\/p>\n\n\n\n<p>Amb la finalitzaci\u00f3 dels treballs, l&#8217;Ajuntament de Torrent aconseguix donar soluci\u00f3 a un dels punts cr\u00edtics del Vedat, refor\u00e7ant la resili\u00e8ncia del barri i garantint que episodis de pluja intensa no tornen a comprometre la seguretat de la zona.<\/p>\n\n\n\n<p><strong>Una actuaci\u00f3 integral i t\u00e8cnicament avan\u00e7ada<\/strong><\/p>\n\n\n\n<p>La intervenci\u00f3 ha consistit en la instal\u00b7laci\u00f3 d&#8217;un nou col\u00b7lector de gran capacitat (DN 800) i 130 metres de longitud, acompanyat de nous pous de registre i moderns sistemes de captaci\u00f3 mitjan\u00e7ant embornals i reixes capaces d&#8217;interceptar grans cabals d&#8217;aigua. Este nou col\u00b7lector permet desviar les escorrenties cap a un punt m\u00e9s favorable aig\u00fces avall, on el pendent garantix un desgu\u00e0s r\u00e0pid i efica\u00e7.<\/p>\n\n\n\n<p>L&#8217;obra substitu\u00efx i amplia la xarxa existent, dimensionada fa d\u00e8cades per a un escenari pluviom\u00e8tric molt distint de l&#8217;actual. Amb este redimensionament hidr\u00e0ulic, l&#8217;evacuaci\u00f3 de l&#8217;aigua torna a operar amb la capacitat necess\u00e0ria per a respondre als episodis de pluja extrema vinculats al canvi clim\u00e0tic.<\/p>\n\n\n\n<p><strong>Un benefici directe per als ve\u00efns del Vedat<\/strong><\/p>\n\n\n\n<p>La finalitzaci\u00f3 de l&#8217;actuaci\u00f3 representa un abans i un despr\u00e9s per als residents de Santa Rosa de Lima i de l&#8217;entorn de la resid\u00e8ncia de majors. Les millores executades garantixen la fi de les inundacions recurrents que durant anys afectaven vivendes, vials i accessos, i aporten ara una seguretat molt major tant per a vehicles com per a vianants en episodis de pluja intensa. La protecci\u00f3 de la resid\u00e8ncia de majors, un dels enclavaments m\u00e9s sensibles de la zona, queda completament refor\u00e7ada, igual que la tranquil\u00b7litat de les fam\u00edlies que vivien cada episodi de fortes pluges amb preocupaci\u00f3. Amb esta intervenci\u00f3, el barri es revaloritza i passa de ser un punt vulnerable a convertir-se en un entorn plenament protegit, la qual cosa suposa una notable millora en el benestar i en la qualitat de vida de tots els seus ve\u00efns.<\/p>\n\n\n\n<p><strong>Una inversi\u00f3 estrat\u00e8gica per a un barri prioritari<\/strong><\/p>\n\n\n\n<p>L&#8217;actuaci\u00f3 ha suposat una inversi\u00f3 total de prop de 200.000 euros, finan\u00e7ada per l&#8217;Ajuntament de Torrent i per l&#8217;empresa mixta Aig\u00fces de l&#8217;Horta, que ha assumit la direcci\u00f3 t\u00e8cnica i part de l&#8217;execuci\u00f3 de l&#8217;obra. Esta inversi\u00f3 respon a una reivindicaci\u00f3 hist\u00f2rica dels ve\u00efns del Vedat i s&#8217;emmarca en l&#8217;estrat\u00e8gia de l&#8217;actual equip de govern per a modernitzar les infraestructures hidr\u00e0uliques i reduir la vulnerabilitat del municipi enfront de fen\u00f2mens meteorol\u00f2gics extrems.<\/p>\n\n\n\n<p>L&#8217;alcaldessa de Torrent, Amparo Folgado, ha subratllat que \u201cesta obra no \u00e9s nom\u00e9s una inversi\u00f3 hidr\u00e0ulica: \u00e9s un comprom\u00eds complit amb els ve\u00efns del Vedat. Acabem amb d\u00e8cades d&#8217;inundacions i aportem seguretat, benestar i qualitat de vida. Santa Rosa de Lima deixa arrere un problema hist\u00f2ric que durant anys havia generat preocupaci\u00f3, danys i malestar. Hui podem dir que l&#8217;actuaci\u00f3 reivindicada pels ve\u00efns \u00e9s una realitat\u201d.<\/p>\n\n\n\n<p>El regidor d&#8217;Urbanisme, Jos\u00e9 Gozalvo -que ja va destacar la import\u00e0ncia d&#8217;esta intervenci\u00f3 en la seua visita inicial a l&#8217;obra- ha assenyalat ara que \u201camb la finalitzaci\u00f3 dels treballs, complim amb una reclamaci\u00f3 que els ve\u00efns porten fent m\u00e9s de trenta anys. Esta actuaci\u00f3 demostra que quan es planifica, s&#8217;invertix i s&#8217;escolta la ciutadania, la ciutat avan\u00e7a\u201d.<\/p>\n\n\n\n<p><strong>Una ciutat m\u00e9s preparada per a les pluges torrencials<\/strong><\/p>\n\n\n\n<p>La finalitzaci\u00f3 de la intervenci\u00f3 en Santa Rosa de Lima forma part del pla global de modernitzaci\u00f3 d&#8217;infraestructures hidr\u00e0uliques impulsat per l&#8217;Ajuntament per a refor\u00e7ar la seguretat dels barris m\u00e9s exposats. El municipi avan\u00e7a aix\u00ed cap a una ciutat m\u00e9s protegida, sostenible i resilient, capa\u00e7 d&#8217;anticipar-se i respondre a l&#8217;efecte de les pluges extremes que cada vegada s\u00f3n m\u00e9s freq\u00fcents.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/1-9-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-88980\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/1-9-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/1-9-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/1-9-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/1-9-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/1-9-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"88982\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/5-4-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-88982\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/5-4-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/5-4-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/5-4-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/5-4-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/5-4-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"88990\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/2-8-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-88990\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/2-8-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/2-8-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/2-8-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/2-8-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/2-8-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"88988\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/6-3-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-88988\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/6-3-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/6-3-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/6-3-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/6-3-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/6-3-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"88986\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/4-5-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-88986\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/4-5-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/4-5-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/4-5-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/4-5-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/4-5-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"88984\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/3-6-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-88984\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/3-6-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/3-6-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/3-6-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/3-6-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/11\/3-6-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>La intervenci\u00f3 soluciona un dels punts m\u00e9s conflictius del Vedat i aporta seguretat, benestar i tranquil\u00b7litat als ve\u00efns L&#8217;Ajuntament de Torrent ha concl\u00f2s les obres de millora del drenatge pluvial al carrer Sant Rosa de Lima, una actuaci\u00f3 llargament esperada i reclamada pels ve\u00efns del Vedat, especialment pels residents de la zona i els usuaris [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":88980,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[127,116,133,140,1160],"tags":[],"class_list":["post-88993","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-2","category-noticies","category-urbanisme","category-urbanismo-3","category-urbanismo-noticias-ca"],"acf":[],"_links":{"self":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/88993","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/comments?post=88993"}],"version-history":[{"count":1,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/88993\/revisions"}],"predecessor-version":[{"id":88995,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/88993\/revisions\/88995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media\/88980"}],"wp:attachment":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media?parent=88993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/categories?post=88993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/tags?post=88993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}