{"id":77500,"date":"2025-02-11T11:27:36","date_gmt":"2025-02-11T10:27:36","guid":{"rendered":"https:\/\/infotorrent.es\/uncategorized\/torrent-avanza-en-la-rehabilitacion-del-puente-hacia-alaquas-en-la-calle-gomez-ferrer\/"},"modified":"2025-02-21T11:37:27","modified_gmt":"2025-02-21T10:37:27","slug":"torrent-avanza-en-la-rehabilitacion-del-puente-hacia-alaquas-en-la-calle-gomez-ferrer","status":"publish","type":"post","link":"https:\/\/infotorrent.es\/ca\/noticies\/urbanisme\/torrent-avanza-en-la-rehabilitacion-del-puente-hacia-alaquas-en-la-calle-gomez-ferrer\/","title":{"rendered":"Torrent avan\u00e7a en la rehabilitaci\u00f3 del pont cap a Alaqu\u00e0s al carrer G\u00f3mez Ferrer"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Una obra clau per a la connectivitat metropolitana de Torrent, Alaqu\u00e0s, Aldaia, Xirivella i Val\u00e8ncia<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Torrent invertix 1,8 milions en la recuperaci\u00f3 del pont hist\u00f2ric sobre el barranc de Poio<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les obres de rehabilitaci\u00f3 del pont sobre el barranc de Poio, al carrer G\u00f3mez Ferrer i l&#8217;antiga CV-4034, avancen segons el que es preveu. L&#8217;alcaldessa de Torrent, Amparo Folgado, juntament amb el regidor d&#8217;Urbanisme, Jos\u00e9 Francisco Gozalvo, ha visitat la zona acompanyada per t\u00e8cnics municipals i representants de l&#8217;empresa adjudicat\u00e0ria de l&#8217;obra, per a comprovar l&#8217;estat actual dels treballs i avaluar els seg\u00fcents passos en el proc\u00e9s de restauraci\u00f3.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El projecte, amb un pressupost d&#8217;1.844.040 euros finan\u00e7at per l&#8217;Ajuntament de Torrent, t\u00e9 un termini d&#8217;execuci\u00f3 estimat de sis mesos. Este pont, constru\u00eft a principis del segle XX, va patir greus danys durant la barrancada del 29 d&#8217;octubre, la qual cosa va provocar la p\u00e8rdua de gran part del tauler instal\u00b7lat en els anys 90. Despr\u00e9s d&#8217;una primera inspecci\u00f3, es va determinar que el pont podia ser rehabilitat, la qual cosa va permetre tra\u00e7ar un pla d&#8217;acci\u00f3 immediat.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En una primera fase, es va procedir a la recuperaci\u00f3 de les connexions de fibra \u00f2ptica i servicis. No obstant aix\u00f2, les obres van haver d&#8217;esperar que Aig\u00fces de l&#8217;Horta reparara el col\u00b7lector nord cap a l&#8217;EDAR, danyat en la zona del pont, la qual cosa provocava abocaments d&#8217;aig\u00fces residuals al barranc i podien afectar els pilars del pont. Despr\u00e9s de la finalitzaci\u00f3 d&#8217;estos treballs, en els quals s&#8217;ha connectat un col\u00b7lector provisional, es van poder iniciar les labors de rehabilitaci\u00f3 del pont.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Fins a la data, segons l&#8217;empresa adjudicat\u00e0ria, s&#8217;ha constru\u00eft un acc\u00e9s al llit del barranc des de la CV-36 per a facilitar els treballs, s&#8217;ha netejat la zona de fonamentaci\u00f3 d&#8217;estreps i piles i s&#8217;han retirat les tones de restes de la barrancada, que podien afectar l&#8217;estructura. A m\u00e9s, s&#8217;est\u00e0 construint una escullera de protecci\u00f3 en la fonamentaci\u00f3 i els estreps del pont, una de les fases m\u00e9s complexes i menys visibles per a la ciutadania.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pr\u00f2ximament, es procedir\u00e0 a la reparaci\u00f3 dels timpans i la ma\u00e7oneria afectada, amb la reconstrucci\u00f3 dels carreus i altres elements patrimonials.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Posteriorment, s&#8217;instal\u00b7lar\u00e0 un nou tauler i es rehabilitar\u00e0 l&#8217;existent en un dels trams, a m\u00e9s d&#8217;executar les defenses, baranes, enllumenat i senyalitzaci\u00f3. Aix\u00ed mateix, es reposaran i canalitzaran els servicis municipals afectats, incloent-hi les connexions dels nous viaductes amb les cal\u00e7ades existents i qualsevol reparaci\u00f3 addicional que es detecte.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Estos treballs hauran de completar-se amb la reposici\u00f3 definitiva del col\u00b7lector nord de Torrent per Aig\u00fces de l&#8217;Horta i la neteja del llit per part de la Confederaci\u00f3 Hidrogr\u00e0fica del X\u00faquer. La coordinaci\u00f3 entre les diferents administracions i entitats implicades \u00e9s fonamental per a garantir la seguretat de la infraestructura i l&#8217;efic\u00e0cia de les obres.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;alcaldessa, Amparo Folgado, ha destacat la import\u00e0ncia de recuperar el pont d&#8217;Alaqu\u00e0s, considerant-lo un s\u00edmbol de la reconstrucci\u00f3 de la ciutat despr\u00e9s de la DANA. <strong>&#8220;\u00c9s crucial per a les connexions amb Alaqu\u00e0s, Aldaia i Xirivella, aix\u00ed com per a la circulaci\u00f3 dels autobusos metropolitans, per la qual cosa la seua recuperaci\u00f3 \u00e9s priorit\u00e0ria&#8221;,<\/strong> ha assenyalat. A m\u00e9s, ha subratllat que la restauraci\u00f3 del pont requerix una inversi\u00f3 major a causa de la necessitat de reposar els elements hist\u00f2rics danyats.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Folgado tamb\u00e9 ha emfatitzat la urg\u00e8ncia de la reobertura completa del pont i ha manifestat el seu desig que el Govern d&#8217;Espanya assumisca el cost d&#8217;esta obra com m\u00e9s prompte millor, tal com s&#8217;havia comprom\u00e9s. <strong>&#8220;Des de l&#8217;Ajuntament estem fent un gran esfor\u00e7 per a finan\u00e7ar esta obra, per\u00f2 considerem que el Govern central ha de comen\u00e7ar a complir els seus compromisos i comen\u00e7ar a enviar els pagaments de tots els treballs de reconstrucci\u00f3&#8221;,<\/strong> afirma.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Per part seua, el regidor d&#8217;Urbanisme, Jos\u00e9 Francisco Gozalvo, ha ressaltat que <strong>\u201cl&#8217;Ajuntament continuar\u00e0 informant sobre els avan\u00e7os de recuperaci\u00f3 del pont cap a Alaqu\u00e0s\u201d <\/strong>i que es treballar\u00e0 per a continuar recuperant les connexions de la ciutat de Torrent, afectades per la barrancada del 29 d&#8217;octubre.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Amb la rehabilitaci\u00f3 d&#8217;este pont, Torrent fa un pas m\u00e9s en la recuperaci\u00f3 de les seues infraestructures despr\u00e9s dels danys ocasionats per la DANA.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"77491\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.553-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-77491\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.553-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.553-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.553-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.553-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.553-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"77495\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.561-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-77495\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.561-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.561-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.561-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.561-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.561-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"77493\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.552-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-77493\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.552-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.552-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.552-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.552-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-10-at-14.29.552-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Una obra clau per a la connectivitat metropolitana de Torrent, Alaqu\u00e0s, Aldaia, Xirivella i Val\u00e8ncia Torrent invertix 1,8 milions en la recuperaci\u00f3 del pont hist\u00f2ric sobre el barranc de Poio Les obres de rehabilitaci\u00f3 del pont sobre el barranc de Poio, al carrer G\u00f3mez Ferrer i l&#8217;antiga CV-4034, avancen segons el que es preveu. L&#8217;alcaldessa [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":77504,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[133,1190,25],"tags":[],"class_list":["post-77500","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-urbanisme","category-ayuntamiento-de-torrent-ca","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/77500","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/comments?post=77500"}],"version-history":[{"count":1,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/77500\/revisions"}],"predecessor-version":[{"id":77503,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/77500\/revisions\/77503"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media\/77504"}],"wp:attachment":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media?parent=77500"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/categories?post=77500"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/tags?post=77500"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}