{"id":77206,"date":"2025-02-06T17:29:28","date_gmt":"2025-02-06T16:29:28","guid":{"rendered":"https:\/\/infotorrent.es\/?p=77206"},"modified":"2025-02-06T17:29:32","modified_gmt":"2025-02-06T16:29:32","slug":"la-generalitat-avanca-en-la-reconstruccio-del-pont-collapsat-de-la-cv-33-a-torrent-amb-una-inversio-de-125-milions-deuros","status":"publish","type":"post","link":"https:\/\/infotorrent.es\/ca\/alcaldia-2\/la-generalitat-avanca-en-la-reconstruccio-del-pont-collapsat-de-la-cv-33-a-torrent-amb-una-inversio-de-125-milions-deuros\/","title":{"rendered":"La Generalitat avan\u00e7a en la reconstrucci\u00f3 del pont col\u00b7lapsat de la CV-33 a Torrent amb una inversi\u00f3 de 12,5 milions d&#8217;euros"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">L&#8217;alcaldessa i el conseller destaquen els avan\u00e7os de les obres<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">El conseller de Medi Ambient, Infraestructures i Territori, Vicente Mart\u00ednez Mus, ha visitat el municipi de Torrent acompanyat per l&#8217;alcaldessa, Amparo Folgado, per a supervisar l&#8217;avan\u00e7 dels treballs de reconstrucci\u00f3 del pont sobre el barranc de Poio, en la CV-33, col\u00b7lapsat despr\u00e9s de la barrancada del passat 29 d&#8217;octubre. La Generalitat ha destinat una inversi\u00f3 de 12,5 milions d&#8217;euros per a l&#8217;execuci\u00f3 d&#8217;esta obra clau per a la connectivitat a l&#8217;Horta Sud.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Durant la visita, Mart\u00ednez Mus ha destacat que &#8220;si el 2024 va ser l&#8217;any de les obres provisionals en les carreteres de la xarxa auton\u00f2mica afectades per les inundacions, el 2025 ser\u00e0 l&#8217;any en qu\u00e8 culminen les obres de reconstrucci\u00f3. El nostre objectiu \u00e9s que les carreteres retornen al seu estat anterior al 29 d&#8217;octubre&#8221;.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El conseller ha subratllat el significatiu avan\u00e7 en el marc del pla \u2018Recuperem Val\u00e8ncia\u2019, ressaltant que \u201ctres mesos despr\u00e9s de les inundacions, ja progressen les primeres actuacions per a instal\u00b7lar el nou pont de la CV-33 despr\u00e9s de finalitzar la demolici\u00f3 de l&#8217;anterior\u201d. Este pas permetr\u00e0 recuperar completament la mobilitat en la zona, restaurant la connexi\u00f3 entre Torrent, l&#8217;Horta Sud i la ciutat de Val\u00e8ncia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Evoluci\u00f3 de les obres en la CV-33<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Els treballs de reconstrucci\u00f3 van comen\u00e7ar l&#8217;1 de novembre amb la retirada d&#8217;enderrocs i la creaci\u00f3 d&#8217;accessos per a la maquin\u00e0ria pesant. El 12 de novembre es va habilitar de manera provisional un carril en cada sentit per a restablir parcialment el tr\u00e0nsit, i el 23 de desembre es va reobrir l&#8217;acc\u00e9s a Picanya.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El conseller ha reafirmat el comprom\u00eds del Consell amb la recuperaci\u00f3 i millora de les infraestructures afectades, assegurant que &#8220;continuarem treballant sense descans per a garantir la seguretat i la mobilitat en les carreteres afectades per la riuada&#8221;.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Danys i mesures de reconstrucci\u00f3<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La barrancada del passat octubre va causar el col\u00b7lapse de l&#8217;estrep del pont en la CV-33 en direcci\u00f3 a Val\u00e8ncia, provocant la solsida completa de l&#8217;estructura i afectant els fonaments dels pilars.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les obres han incl\u00f2s el refor\u00e7 dels fonaments amb injeccions de formig\u00f3 per a garantir l&#8217;estabilitat del nou pont. A m\u00e9s, s&#8217;han dut a terme tasques de neteja de la via, retirada de vehicles afectats, restauraci\u00f3 de sistemes de seguretat i senyalitzaci\u00f3, i adequaci\u00f3 de la infraestructura per al seu \u00f2ptim funcionament.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;alcaldessa, Amparo Folgado ha manifestat que \u201cvull agrair a la Generalitat l&#8217;esfor\u00e7 i la inversi\u00f3 destinada a esta obra. La reconstrucci\u00f3 d&#8217;este pont \u00e9s essencial per a Torrent i per a tota l&#8217;Horta Sud. Des del primer moment hem treballat al costat de la Generalitat per a garantir que esta infraestructura vital es recupere al m\u00e9s prompte possible. La cooperaci\u00f3 entre les dos administracions est\u00e0 sent clau per a donar respostes r\u00e0pides, reals i efectives a les necessitats dels ciutadans i del municipi\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cDespr\u00e9s de les greus inundacions, la nostra prioritat ha sigut retornar la normalitat als nostres ve\u00efns. Esta obra no sols restablix la mobilitat, sin\u00f3 que tamb\u00e9 refor\u00e7a la seguretat de la zona davant futurs episodis meteorol\u00f2gics. Estem avan\u00e7ant amb rapidesa perqu\u00e8 Torrent recupere la seua connexi\u00f3 amb Val\u00e8ncia en les millors condicions\u201d, ha assenyalat l&#8217;alcaldessa.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/1-10-1024x682.jpg\" alt=\"\" class=\"wp-image-77197\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/1-10-1024x682.jpg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/1-10-300x200.jpg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/1-10-768x512.jpg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/1-10-1536x1023.jpg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/1-10.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/2-6-1024x682.jpg\" alt=\"\" class=\"wp-image-77199\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/2-6-1024x682.jpg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/2-6-300x200.jpg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/2-6-768x512.jpg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/2-6-1536x1023.jpg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/2-6.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/3-5-1024x682.jpg\" alt=\"\" class=\"wp-image-77201\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/3-5-1024x682.jpg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/3-5-300x200.jpg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/3-5-768x512.jpg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/3-5-1536x1023.jpg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/3-5.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/4-3-1-1024x682.jpg\" alt=\"\" class=\"wp-image-77203\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/4-3-1-1024x682.jpg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/4-3-1-300x200.jpg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/4-3-1-768x512.jpg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/4-3-1-1536x1023.jpg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2025\/02\/4-3-1.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>L&#8217;alcaldessa i el conseller destaquen els avan\u00e7os de les obres El conseller de Medi Ambient, Infraestructures i Territori, Vicente Mart\u00ednez Mus, ha visitat el municipi de Torrent acompanyat per l&#8217;alcaldessa, Amparo Folgado, per a supervisar l&#8217;avan\u00e7 dels treballs de reconstrucci\u00f3 del pont sobre el barranc de Poio, en la CV-33, col\u00b7lapsat despr\u00e9s de la barrancada [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":77197,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[141,138,140],"tags":[],"class_list":["post-77206","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-alcaldia-2","category-medio-ambiente-2","category-urbanismo-3"],"acf":[],"_links":{"self":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/77206","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/comments?post=77206"}],"version-history":[{"count":1,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/77206\/revisions"}],"predecessor-version":[{"id":77208,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/77206\/revisions\/77208"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media\/77197"}],"wp:attachment":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media?parent=77206"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/categories?post=77206"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/tags?post=77206"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}