{"id":74291,"date":"2024-11-26T13:05:26","date_gmt":"2024-11-26T12:05:26","guid":{"rendered":"https:\/\/infotorrent.es\/uncategorized\/el-ayuntamiento-de-torrent-acelera-la-recuperacion-de-puentes-y-pasos-sobre-el-barranco-de-lhorteta-tras-la-dana\/"},"modified":"2024-11-26T13:07:23","modified_gmt":"2024-11-26T12:07:23","slug":"el-ayuntamiento-de-torrent-acelera-la-recuperacion-de-puentes-y-pasos-sobre-el-barranco-de-lhorteta-tras-la-dana","status":"publish","type":"post","link":"https:\/\/infotorrent.es\/ca\/noticies\/urbanisme\/el-ayuntamiento-de-torrent-acelera-la-recuperacion-de-puentes-y-pasos-sobre-el-barranco-de-lhorteta-tras-la-dana\/","title":{"rendered":"L&#8217;Ajuntament de Torrent accelera la recuperaci\u00f3 de ponts i passos sobre el barranc de l\u2019Horteta despr\u00e9s de la DANA"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>El pas pel Clot de Bail\u00f3n avan\u00e7a amb la formigonada del llit i la instal\u00b7laci\u00f3 de cinc tubs per al pas de l&#8217;aigua<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;Ajuntament de Torrent continua treballant intensament en la recuperaci\u00f3 dels ponts municipals i els passos afectats pel barranc de l\u2019Horteta, despr\u00e9s dels greus danys ocasionats per la DANA del passat 29 d&#8217;octubre. Un dels principals focus d&#8217;actuaci\u00f3 \u00e9s el Cam\u00ed de Xarcos Secs, que ja ha sigut reobert parcialment despr\u00e9s d&#8217;importants labors de neteja realitzades pel Consell Agrari i empreses locals contractades.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este cam\u00ed \u00e9s de vital import\u00e0ncia, ja que connecta nombrosos nuclis de poblaci\u00f3 en el terme municipal de Torrent. No obstant aix\u00f2, encara queda molta faena per a retornar-li el seu estat original. En este sentit, l&#8217;Ajuntament ha prioritzat la restauraci\u00f3 del pas inundable situat abans d&#8217;arribar als Arquets de Dalt, un dels punts m\u00e9s afectats.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ahir, el regidor d&#8217;Urbanisme, Vivenda i Medi Ambient, Jos\u00e9 Francisco Gozalvo, va visitar el lloc juntament amb t\u00e8cnics municipals, representants de la Conselleria d&#8217;Agricultura, l&#8217;empresa constructora Pavasal i dos guardes fluvials de la Confederaci\u00f3 Hidrogr\u00e0fica del X\u00faquer (CHJ). Durant la reuni\u00f3, es van avaluar possibles solucions per a reconstruir el pas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cL&#8217;opci\u00f3 m\u00e9s segura i efica\u00e7 \u00e9s elevar el pas inundable en dos metres mitjan\u00e7ant calaixos de formig\u00f3. Esta mesura permetr\u00e0 que l&#8217;aigua flu\u00efsca sense obstacles per davall, evitant que el cam\u00ed quede intransitable durant episodis de pluges torrencials habituals. El nostre objectiu \u00e9s garantir la seguretat dels ve\u00efns i agricultors, a m\u00e9s de mantindre la connectivitat entre les zones rurals\u201d, va explicar Gozalvo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una altra alternativa plantejada seria reconstruir el pas tal com estava abans de la DANA, encara que esta opci\u00f3 no oferiria millores significatives enfront de futures inundacions. S&#8217;espera prendre una decisi\u00f3 definitiva en breu, segons valide la CHJ per a reobrir este cam\u00ed essencial que connecta \u00e0rees com Corral de Manyet, La Pardala, La Pir\u00e0mide i Font de la Teula amb la resta del municipi.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Avan\u00e7os en el pas del Clot de Bail\u00f3n<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En el pas pel Clot de Bail\u00f3n, ja s&#8217;han iniciat els treballs de moviment de terres per a preparar el llit. S&#8217;estan formigonant els fonaments i restaurant l&#8217;obra de drenatge mitjan\u00e7ant la instal\u00b7laci\u00f3 de cinc tubs de D.400 sobre un llit de formig\u00f3. Sobre estos, s&#8217;executar\u00e0 una solera de formig\u00f3 de 20 cm amb malla electrosoldada per a refor\u00e7ar l&#8217;estructura.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cEste pas estar\u00e0 operatiu en un termini molt curt. \u00c9s una obra clau per a restablir la connexi\u00f3 entre els nuclis del nord-oest del terme municipal amb el Cam\u00ed del Corral de Manyes i el cam\u00ed de Xarcos Secs\u201d, va assegurar Gozalvo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pont d&#8217;Alaqu\u00e0s: obres d&#8217;emerg\u00e8ncia<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El pont que unix el carrer G\u00f3mez Ferrer amb la carretera d&#8217;Alaqu\u00e0s tamb\u00e9 est\u00e0 en proc\u00e9s de recuperaci\u00f3. Actualment, es realitzen tastos en el barranc, aix\u00ed com an\u00e0lisis detallades de les fonamentacions, piles i estreps del pont. Estes inspeccions determinaran l&#8217;abast dels treballs necessaris, que l&#8217;Ajuntament ha qualificat com a obra d&#8217;emerg\u00e8ncia a causa de la seua import\u00e0ncia estrat\u00e8gica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cEste pont \u00e9s fonamental per a la mobilitat urbana i el transport p\u00fablic a Torrent. Estem agilitzant tots els tr\u00e0mits perqu\u00e8 les obres comencen #al m\u00e9s prompte possible i es realitzen amb les m\u00e0ximes garanties de seguretat\u201d, destaca el regidor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Altres ponts en proc\u00e9s de recuperaci\u00f3<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El pont de Quatre Camins, que connecta el carrer Val\u00e8ncia amb el pol\u00edgon industrial Mes del Jutge, va ser reobert el passat 1 de novembre despr\u00e9s d&#8217;una intervenci\u00f3 inicial. No obstant aix\u00f2, encara es treballa en la documentaci\u00f3 t\u00e8cnica i la instal\u00b7laci\u00f3 d&#8217;un clos definitiu, il\u00b7luminaci\u00f3 i altres treballs en el llit del barranc, per a garantir la seua plena funcionalitat.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Per part seua, el xicotet pont situat al costat dels Arquets de Baix, en el Cam\u00ed dels Arquets, va ser reobert a principis d&#8217;este mes. La Conselleria d&#8217;Agricultura i l&#8217;empresa Pavasal estan col\u00b7laborant per a implementar una soluci\u00f3 que permeta el pas de l&#8217;aigua mitjan\u00e7ant calaixos de formig\u00f3, pendent de validaci\u00f3 per part de la CHJ.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Comprom\u00eds amb la recuperaci\u00f3 integral<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El regidor Gozalvo va reafirmar el comprom\u00eds de l&#8217;Ajuntament de Torrent per a recuperar totes les infraestructures afectades #al m\u00e9s prompte possible: \u201cLa DANA ha deixat una petjada important en el nostre municipi, afectant sobretot les nostres comunicacions, per\u00f2 estem treballant amb tots els recursos disponibles per a restablir la normalitat. Agra\u00efm la col\u00b7laboraci\u00f3 de la Generalitat, les empreses locals i la CHJ en estes actuacions\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;Ajuntament continuar\u00e0 informant sobre els avan\u00e7os en estes obres fonamentals per a la connectivitat i la seguretat de Torrent, mentres continua prioritzant les solucions que oferisquen major resili\u00e8ncia davant fen\u00f2mens clim\u00e0tics extrems.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-1024x682.jpeg\" alt=\"\" class=\"wp-image-74279\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"74283\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-4-1024x682.jpeg\" alt=\"\" class=\"wp-image-74283\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-4-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-4-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-4-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-4-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-4.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"74284\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-3-1024x682.jpeg\" alt=\"\" class=\"wp-image-74284\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-3-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-3-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-3-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-3-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-3.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"74281\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-2-1024x682.jpeg\" alt=\"\" class=\"wp-image-74281\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-2-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-2-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-2-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-2-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-2.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"74287\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-1-1024x682.jpeg\" alt=\"\" class=\"wp-image-74287\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-1-1024x682.jpeg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-1-300x200.jpeg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-1-768x512.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-1-1536x1023.jpeg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2024\/11\/WhatsApp-Image-2024-11-26-at-13.00.10-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>El pas pel Clot de Bail\u00f3n avan\u00e7a amb la formigonada del llit i la instal\u00b7laci\u00f3 de cinc tubs per al pas de l&#8217;aigua L&#8217;Ajuntament de Torrent continua treballant intensament en la recuperaci\u00f3 dels ponts municipals i els passos afectats pel barranc de l\u2019Horteta, despr\u00e9s dels greus danys ocasionats per la DANA del passat 29 d&#8217;octubre. [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":74295,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[133,1190],"tags":[],"class_list":["post-74291","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-urbanisme","category-ayuntamiento-de-torrent-ca"],"acf":[],"_links":{"self":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/74291","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/comments?post=74291"}],"version-history":[{"count":1,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/74291\/revisions"}],"predecessor-version":[{"id":74294,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/74291\/revisions\/74294"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media\/74295"}],"wp:attachment":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media?parent=74291"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/categories?post=74291"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/tags?post=74291"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}