{"id":57398,"date":"2023-06-07T07:35:03","date_gmt":"2023-06-07T07:35:03","guid":{"rendered":"https:\/\/infotorrent.es\/uncategorized\/el-plan-200-000-se-extiende-a-otros-puntos-de-torrent\/"},"modified":"2023-06-14T07:41:26","modified_gmt":"2023-06-14T07:41:26","slug":"el-plan-200-000-se-extiende-a-otros-puntos-de-torrent","status":"publish","type":"post","link":"https:\/\/infotorrent.es\/ca\/gestion-ciudad-2\/el-plan-200-000-se-extiende-a-otros-puntos-de-torrent\/","title":{"rendered":"El \u2018Pla 200.000\u2019 s&#8217;est\u00e9n a altres punts de Torrent"},"content":{"rendered":"\n<p><strong>Els equips de treball han escom\u00e8s aquesta setmana la renovaci\u00f3 dels carrers calles Verge de la Pau, Germanies, El Salvador, La Ribera, Sant Ferm\u00ed, Rosendo Montoro o Miramar, entre altres<\/strong><\/p>\n\n\n\n<p><br><strong>Despr\u00e9s de mesos d&#8217;intens treball, el consistori superar\u00e0, pr\u00f2ximament, els 200.000km de vies renovades<\/strong><\/p>\n\n\n\n<p> L&#8217;Ajuntament de Torrent continua estenent les actuacions del \u2018Pla 200.000\u2019 a altres punts de la ciutat, en el marc de la seua estrat\u00e8gia d&#8217;inversions per al per\u00edode 2022-2025. Aix\u00ed, durant les \u00faltimes setmanes els equips de treball han escom\u00e8s la renovaci\u00f3 dels carrers Verge de la Pau, Germanies, El Salvador, La Ribera, Sant Ferm\u00ed, Rosendo Montoro o Miramar, entre altres, realitzant labors d&#8217;asfaltat i fresat de les vies.<\/p>\n\n\n\n<p><br>Aquestes intervencions se sumen a les efectuades el mes de maig passat als carrers\u00a0Alb\u00e9niz, Maestro Granados, Alberca, Baladre, Eduardo\u00a0Dato, Santa Gemma, Juan de\u00a0Juanes, Pintor\u00a0Sorolla o Almirall\u00a0Cadarso, superant ja la xifra de 180.000km de vies renovades en tot el municipi. Tal com es va donar a con\u00e8ixer fa unes setmanes, el consistori\u00a0torrent\u00ed preveu ampliar les actuacions del pla, de manera que finalment se superen els 200.000 km inicialment projectats.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"57394\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/20230607_143035-576x1024.jpg\" alt=\"\" class=\"wp-image-57394\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/20230607_143035-576x1024.jpg 576w, https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/20230607_143035-169x300.jpg 169w, https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/20230607_143035-768x1365.jpg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/20230607_143035-864x1536.jpg 864w, https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/20230607_143035-1152x2048.jpg 1152w, https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/20230607_143035-scaled.jpg 1440w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"57392\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/plan-200-768x1024.jpeg\" alt=\"\" class=\"wp-image-57392\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/plan-200-768x1024.jpeg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/plan-200-225x300.jpeg 225w, https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/plan-200-1152x1536.jpeg 1152w, https:\/\/infotorrent.es\/wp-content\/uploads\/2023\/06\/plan-200.jpeg 1200w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n<\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Els equips de treball han escom\u00e8s aquesta setmana la renovaci\u00f3 dels carrers calles Verge de la Pau, Germanies, El Salvador, La Ribera, Sant Ferm\u00ed, Rosendo Montoro o Miramar, entre altres Despr\u00e9s de mesos d&#8217;intens treball, el consistori superar\u00e0, pr\u00f2ximament, els 200.000km de vies renovades L&#8217;Ajuntament de Torrent continua estenent les actuacions del \u2018Pla 200.000\u2019 a [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":57402,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1135],"tags":[],"class_list":["post-57398","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gestion-ciudad-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/57398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/comments?post=57398"}],"version-history":[{"count":1,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/57398\/revisions"}],"predecessor-version":[{"id":57401,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/57398\/revisions\/57401"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media\/57402"}],"wp:attachment":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media?parent=57398"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/categories?post=57398"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/tags?post=57398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}