{"id":104052,"date":"2026-11-04T12:47:21","date_gmt":"2026-11-04T11:47:21","guid":{"rendered":"https:\/\/infotorrent.es\/?p=104052"},"modified":"2026-11-04T12:54:06","modified_gmt":"2026-11-04T11:54:06","slug":"torrent-licita-per-prop-de-8-milions-deuros-la-construccio-del-nou-ceip-lope-de-vega-dins-del-pla-edificant","status":"publish","type":"post","link":"https:\/\/infotorrent.es\/ca\/noticies\/educacio\/torrent-licita-per-prop-de-8-milions-deuros-la-construccio-del-nou-ceip-lope-de-vega-dins-del-pla-edificant\/","title":{"rendered":"Torrent licita per prop de 8 milions d&#8217;euros la construcci\u00f3 del nou CEIP Lope de Vega dins del Pla Edificant"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>El projecte contempla la demolici\u00f3 de l&#8217;actual col\u00b7legi i la construcci\u00f3 d&#8217;un nou centre educatiu en el mateix solar, amb instal\u00b7lacions modernes, accessibles i adaptades a les necessitats de l&#8217;alumnat.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>L&#8217;actuaci\u00f3 inclour\u00e0 noves aules d&#8217;Infantil i Prim\u00e0ria, menjador, gimn\u00e0s, biblioteca i espais esportius.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;Ajuntament de Torrent ha aprovat la licitaci\u00f3 de les obres de reposici\u00f3 del CEIP Lope de Vega, amb un pressupost de 7.946.056,11 euros, IVA incl\u00f2s, en el marc del Pla Edificant de la Generalitat Valenciana. L&#8217;actuaci\u00f3 permetr\u00e0 substituir les actuals instal\u00b7lacions per un nou centre educatiu, adaptat a les necessitats de la comunitat escolar i als requisits actuals de seguretat, accessibilitat i efici\u00e8ncia energ\u00e8tica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El projecte, contempla la demolici\u00f3 de l&#8217;edifici existent i la construcci\u00f3 d&#8217;un nou col\u00b7legi en el mateix empla\u00e7ament, situat al carrer Doctor Francisco Rosell\u00f3, n\u00famero 25. La intervenci\u00f3 respon a la necessitat de renovar unes instal\u00b7lacions que, malgrat les reformes parcials realitzades al llarg dels anys, presenten importants limitacions a causa de la seua antiguitat.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El futur centre comptar\u00e0 amb un edifici de tres plantes, amb una distribuci\u00f3 dissenyada per a atendre les necessitats de les diferents etapes educatives. La planta baixa albergar\u00e0 huit aules d&#8217;Educaci\u00f3 Infantil, dos d&#8217;elles destinades a alumnat de dos anys, a m\u00e9s dels espais administratius, el menjador amb cuina pr\u00f2pia i el gimn\u00e0s amb vestuaris.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les plantes superiors estaran destinades principalment a Educaci\u00f3 Prim\u00e0ria, amb dotze aules ordin\u00e0ries, aix\u00ed com espais espec\u00edfics per a inform\u00e0tica, m\u00fasica, suport educatiu i activitats polivalents. El nou col\u00b7legi disposar\u00e0 tamb\u00e9 de biblioteca, sales per al professorat i espais d&#8217;\u00fas com\u00fa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;actuaci\u00f3 inclour\u00e0 l&#8217;adequaci\u00f3 dels patis i les zones exteriors, amb espais de joc per als m\u00e9s xicotets, una pista esportiva i \u00e0rees destinades a activitats a l&#8217;aire lliure. El nou edifici incorporar\u00e0 solucions per a millorar el confort t\u00e8rmic, reduir el consum energ\u00e8tic i garantir l&#8217;accessibilitat de les instal\u00b7lacions. El contracte establix un termini d&#8217;execuci\u00f3 de 20 mesos, que comen\u00e7ar\u00e0 a comptar despr\u00e9s de la corresponent comprovaci\u00f3 del replanteig de les obres.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/11\/1-2026-11-04T124602.993-1024x682.jpg\" alt=\"\" class=\"wp-image-104049\" srcset=\"https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/11\/1-2026-11-04T124602.993-1024x682.jpg 1024w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/11\/1-2026-11-04T124602.993-300x200.jpg 300w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/11\/1-2026-11-04T124602.993-768x512.jpg 768w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/11\/1-2026-11-04T124602.993-1536x1024.jpg 1536w, https:\/\/infotorrent.es\/wp-content\/uploads\/2026\/11\/1-2026-11-04T124602.993-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>El projecte contempla la demolici\u00f3 de l&#8217;actual col\u00b7legi i la construcci\u00f3 d&#8217;un nou centre educatiu en el mateix solar, amb instal\u00b7lacions modernes, accessibles i adaptades a les necessitats de l&#8217;alumnat. L&#8217;actuaci\u00f3 inclour\u00e0 noves aules d&#8217;Infantil i Prim\u00e0ria, menjador, gimn\u00e0s, biblioteca i espais esportius. L&#8217;Ajuntament de Torrent ha aprovat la licitaci\u00f3 de les obres de reposici\u00f3 [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":104049,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1190,121,1184,132,1158,155,145,146,1135,133,140,1160],"tags":[],"class_list":["post-104052","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ayuntamiento-de-torrent-ca","category-educacio","category-educacio-educacion-noticias-ca","category-educacion-2","category-educacion-noticias-ca","category-gestio-ciutat","category-gestio-de-recursos-i-modernitzacio","category-gestion-de-recursos-y-modernizacion-2","category-gestion-ciudad-2","category-urbanisme","category-urbanismo-3","category-urbanismo-noticias-ca"],"acf":[],"_links":{"self":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/104052","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/comments?post=104052"}],"version-history":[{"count":1,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/104052\/revisions"}],"predecessor-version":[{"id":104054,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/posts\/104052\/revisions\/104054"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media\/104049"}],"wp:attachment":[{"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/media?parent=104052"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/categories?post=104052"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infotorrent.es\/ca\/wp-json\/wp\/v2\/tags?post=104052"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}